There are three process flows for rotational molds
Remove excess materials through rough cutting and forging, leaving 0.5-1mm of precision machining allowance, and then use CNC equipment for precision machining to ensure accuracy and surface quality. Complex molds need to be welded and assembled, and finally drilled and tapped.
Inventory the materials and tools, check their conditions, and plan the site. Hoist and transport the main body of the mold for pre-installation, tighten the bolts diagonally, and adjust the clearance. Assemble the mold base on the platform according to the drawing, carry out positioning spot welding and then welding. Take measures to prevent deformation and conduct cleaning after welding. Finally, check the appearance dimensions of the mold and the mold base, conduct no-load and load tests, and optimize the performance
is a leading manufacturer of technically advanced products. Our state-of-the-art, vertically integrated, and highly efficient manufacturing facility is located in Ningbo,Zhejiang,China. Our manufacturing facility of over 20000 square meter and our investment in up to date technology in both casting and CNC machines, we strive to continue to be on top of the field of mold suppliers
Contact
Fast, professional and reliablewe provide you with servicesthroughout the product lifecycle.
Newsletter
Welcome
Copyright © 2013-2025 Ningbo Jinhong Mold Co., Ltd
Hello, I am the online customer service